Contact us to receive an offer.
| Manufacturer | GG Module |
|---|---|
| Model | - |
| Year | |
| Location | Switzerland
|
| Category | Complete lines - Miscellaneous production |
| worked hours | |
| hours under power | |
| state | as-is, where-is |
| At local norms | --------- |
| status | |
| Datasheet | GG Module - |
| Last availability date | 30/10/2026 |
| Product id | P261030224 |
| Language |
GG Module gas generator (GG). The model is not specified. The supplied description reports 44,542 operating hours and 495 starts. These figures are presented as recorded operating history; no additional operating-hour or start information is provided.
In 2007, at 23,447 operating hours, the unit underwent an HPGI inspection with BH, described as the 25,000-hour inspection. As part of the LTSA, the following components were replaced with new or rotable parts: the combustion liner, the first-stage nozzle, and the high-pressure turbine assembly. The turbine assembly work included the second-stage nozzles, first- and second-stage buckets, and rotor. The description also records a changeover of the #5 bearing.
According to the supplied history, the GG has operated since that work without major issue. This statement reflects the information provided and is not a claim of current tested condition or a guarantee of performance. No further details are provided about present condition, inspection results, included accessories, or the scope of any work after the 2007 inspection. The year of manufacture and a specific model designation are not stated.
The following description has been generated using artificial intelligence based on the product information available. It is provided for guidance only and may not reflect all specifications or conditions. Please contact us if you need precise or confirmed details.
GG Module
The GG has accumulated 44542 Operating hours and 495 starts.
In 2007 when the unit had 23447 we performed with BH the HPGI inspection (25’000 OH). As part of the LTSA the followings’ parts were replaced with new or rotable:
combustion liner,
1st stage nozzle,
high pressure turbine assembly (2ndstage nozzles, 1st and 2nd stage buckets and rotor)
Change over of #5 bearing
Since the GG has been in operations without major issue.
Please note that this description may have been translated or optimized with artificial intelligence (AI) automatically. The information of this classified ad are only indicative. We recommend to check the details with the seller before a purchase.
| Client type | Factory – small or medium company |
| Active since | 2026 |
| Offers online | 8 |
| Last activity | Oct. 30, 2026 |
GG Module
The GG has accumulated 44542 Operating hours and 495 starts.
In 2007 when the unit had 23447 we performed with BH the HPGI inspection (25’000 OH). As part of the LTSA the followings’ parts were replaced with new or rotable:
combustion liner,
1st stage nozzle,
high pressure turbine assembly (2ndstage nozzles, 1st and 2nd stage buckets and rotor)
Change over of #5 bearing
Since the GG has been in operations without major issue.
Please note that this description may have been translated or optimized with artificial intelligence (AI) automatically. The information of this classified ad are only indicative. We recommend to check the details with the seller before a purchase.
| Category | Complete lines - Miscellaneous production |
| worked hours | |
| hours under power | |
| state | as-is, where-is |
| At local norms | --------- |
| status | |
| Datasheet | GG Module - |
| Last availability date | 30/10/2026 |
| Product id | P261030224 |
| Language |
GG Module gas generator (GG). The model is not specified. The supplied description reports 44,542 operating hours and 495 starts. These figures are presented as recorded operating history; no additional operating-hour or start information is provided.
In 2007, at 23,447 operating hours, the unit underwent an HPGI inspection with BH, described as the 25,000-hour inspection. As part of the LTSA, the following components were replaced with new or rotable parts: the combustion liner, the first-stage nozzle, and the high-pressure turbine assembly. The turbine assembly work included the second-stage nozzles, first- and second-stage buckets, and rotor. The description also records a changeover of the #5 bearing.
According to the supplied history, the GG has operated since that work without major issue. This statement reflects the information provided and is not a claim of current tested condition or a guarantee of performance. No further details are provided about present condition, inspection results, included accessories, or the scope of any work after the 2007 inspection. The year of manufacture and a specific model designation are not stated.
The following description has been generated using artificial intelligence based on the product information available. It is provided for guidance only and may not reflect all specifications or conditions. Please contact us if you need precise or confirmed details.
| Client type | Factory – small or medium company |
| Active since | 2026 |
| Offers online | 8 |
| Last activity | Oct. 30, 2026 |
| Type of process | manufacturing |
|---|
United Kingdom
Spain
2005
| Type of process | manufacturing |
|---|
| Capacity | 1500 u/h |
|---|
| Type of process | manufacturing |
|---|
Greece
Greece
Switzerland
Belgium
2009
Turkey
Switzerland
2004
Bulgaria
Romania
Italy
Switzerland