Automatic description (AI-Generated)
Overview
Complete 10 hl (1,000 L) craft brewery package based on a BBC INOX Essential 1000 two-vessel, steam-heated brewhouse (2019). The package covers milling through bottling and is suitable for a new brewery or a brewpub expanding to 10 hl; fermentation capacity can be extended.
Key capacities and performance
- Brew length: 10 hl (1,000 L) per brew
- Fermentation: 3 × 18 hl gross (~15 hl working each)
- Estimated cellar output with three fermenters on three-week cycles: approx. 700–800 hl/year
Main equipment (scope of delivery)
- Brewhouse: BBC INOX Essential 1000 — two vessels in AISI 304, steam-heated; mash/boil kettle 1,600 L with whirlpool inlet; lauter tun 1,300 L with false bottom and rake; AISI 316 wort pump; grant; platform and stairs; control panel with 15 recipes
- Hot liquor tank: 2,000 L, AISI 304, internal steam coil, CIP spray ball, manway, level gauge and pump
- Plate heat exchanger: Kelvion NT 25 PH, AISI 316 plates, rated 2,000 L/h (wort cooling range noted in original specification)
- Fermentation cellar: 3 × BBC INOX cylindro-conical fermenters, 18 hl, AISI 316, 60° cone, dual‑zone glycol jackets, individual temperature controllers, CIP spray ball, sampling valve; fermenters are atmospheric
- Glycol chiller: outdoor monobloc with buffer tank and circulation pump; glycol capacity down to −5 °C
- Steam generator for brewhouse and hot liquor tank
- Water softener: ion-exchange column with brine tank
- Bottling/priming tank (AISI 304/316)
- Linear gravity bottle filler: 6 spouts, 480 L/h, compatible with 33 / 50 / 75 cl formats
- Semi-automatic labeller (OMB) for front and back labels; crown capper (AIR-MATIC) pneumatic column, 26 / 29 mm crowns
- Walk-in cold room: dismountable panels, 5.30 × 3.10 × 2.50 m (H), nominal +2 to +10 °C
- Malt mill (two hardened-steel rollers), digital floor scale (stainless steel), semi-electric and manual stackers, floor scrubber-dryer, stainless steel workbench, wire-mesh storage baskets
- Consumables and spares included in the original scope: hoses with DIN fittings, approx. 1,600 empty bottles, 250 cartons, 3 × 20 L kegs, and 2,000 crown caps
Condition and handling notes
- Condition as listed: used, visually very good, clean installation; equipment remains installed and under power
- Fermenters are atmospheric; carbonation is achieved by bottle conditioning or via an additional pressure tank (not included unless specified)
- Chiller, cold room and steam generator must be disconnected by certified technicians prior to removal
Availability and logistics
- Immediate availability; dismantling and loading to be arranged and paid for by the buyer
- The brewhouse, hot liquor tank and heat exchanger can also be offered as a separate package
Notes
All technical details and included items are stated as provided in the listing information.
The following description has been generated using artificial intelligence based on the product information available. It is provided for guidance only and may not reflect all specifications or conditions. Please contact us if you need precise or confirmed details.