Contact us to receive an offer.
| Category | Energy - Gas turbines |
| worked hours | |
| hours under power | |
| state | as-is, where-is |
| At local norms | --------- |
| status | visible |
| Datasheet | Nuovo Pignone - |
| Last availability date | 30/10/2026 |
| Product id | P261030230 |
| Language |
Steam turbine and generator set supplied by Nuovo Pignone and installed in 2002. The steam turbine is a Nuovo Pignone SC1-8 model, and the generator is an Ansaldo GSCT 900Y4 model.
According to the available description, the set has accumulated 44,400 running hours and 229 starts. Most of its operating hours were accumulated between 2003 and 2016; by December 2016, the recorded total had reached 41,500 hours.
Maintenance was carried out in line with Nuovo Pignone and Ansaldo requirements through 2016. From 2017 onward, the maintenance approach changed to inspections based on condition, with the stated aim of reducing costs. The existing description reports that no problems were noticed during operation, given the unit’s limited running hours. This is a summary of the information provided and is not a statement that the equipment has been tested or confirmed to be in working condition.
The package comprises a steam turbine and generator, with the turbine manufactured by Nuovo Pignone and the generator manufactured by Ansaldo. The supplied information identifies the installation year, operating history and maintenance approach; it does not provide further details about the present condition, included accessories or recent inspection results.
The following description has been generated using artificial intelligence based on the product information available. It is provided for guidance only and may not reflect all specifications or conditions. Please contact us if you need precise or confirmed details.
Steam Turbine + Generator Set.
The steam Turbine together with the generator were supplied by Nuovo Pignone and installed in 2002.
The steam Turbine (Model SC1-8 and S/N V01467) is from nuovo Pignone.
The generator is an ANSALDO units Model GSCT 900Y4 s/n 8006185 (10,200KVA-6000 V)
the maintenance was performed according Nuovo Pignone and Ansaldo requirements.
The train as accumulated 44400 running hours with 229 starts
The unit accumulated the majority of the OH in the period 2003- 2016 reaching in December 2016 the 41500 OH.
Till the 2016 the maintenance was performed according to NP and Ansaldo requirements.
Since 2017 to reduce costs it was decided to perform the inspection only on conditions.
Considering the limited running hours never was noticed any problems.
Please note that this description may have been translated or optimized with artificial intelligence (AI) automatically. The information of this classified ad are only indicative. We recommend to check the details with the seller before a purchase.
| Client type | Factory – small or medium company |
| Active since | 2026 |
| Offers online | 8 |
| Last activity | Oct. 30, 2026 |
Steam Turbine + Generator Set.
The steam Turbine together with the generator were supplied by Nuovo Pignone and installed in 2002.
The steam Turbine (Model SC1-8 and S/N V01467) is from nuovo Pignone.
The generator is an ANSALDO units Model GSCT 900Y4 s/n 8006185 (10,200KVA-6000 V)
the maintenance was performed according Nuovo Pignone and Ansaldo requirements.
The train as accumulated 44400 running hours with 229 starts
The unit accumulated the majority of the OH in the period 2003- 2016 reaching in December 2016 the 41500 OH.
Till the 2016 the maintenance was performed according to NP and Ansaldo requirements.
Since 2017 to reduce costs it was decided to perform the inspection only on conditions.
Considering the limited running hours never was noticed any problems.
Please note that this description may have been translated or optimized with artificial intelligence (AI) automatically. The information of this classified ad are only indicative. We recommend to check the details with the seller before a purchase.
| Category | Energy - Gas turbines |
| worked hours | |
| hours under power | |
| state | as-is, where-is |
| At local norms | --------- |
| status | visible |
| Datasheet | Nuovo Pignone - |
| Last availability date | 30/10/2026 |
| Product id | P261030230 |
| Language |
Steam turbine and generator set supplied by Nuovo Pignone and installed in 2002. The steam turbine is a Nuovo Pignone SC1-8 model, and the generator is an Ansaldo GSCT 900Y4 model.
According to the available description, the set has accumulated 44,400 running hours and 229 starts. Most of its operating hours were accumulated between 2003 and 2016; by December 2016, the recorded total had reached 41,500 hours.
Maintenance was carried out in line with Nuovo Pignone and Ansaldo requirements through 2016. From 2017 onward, the maintenance approach changed to inspections based on condition, with the stated aim of reducing costs. The existing description reports that no problems were noticed during operation, given the unit’s limited running hours. This is a summary of the information provided and is not a statement that the equipment has been tested or confirmed to be in working condition.
The package comprises a steam turbine and generator, with the turbine manufactured by Nuovo Pignone and the generator manufactured by Ansaldo. The supplied information identifies the installation year, operating history and maintenance approach; it does not provide further details about the present condition, included accessories or recent inspection results.
The following description has been generated using artificial intelligence based on the product information available. It is provided for guidance only and may not reflect all specifications or conditions. Please contact us if you need precise or confirmed details.
| Client type | Factory – small or medium company |
| Active since | 2026 |
| Offers online | 8 |
| Last activity | Oct. 30, 2026 |