For the transition to a larger plant we yield
Industrial extraction system for welding fumes and metalworking dust.

The plant is fully functional and manufactured by the GGE company (Made in Italy)
The plant also complies with all the regulations currently in force regarding emissions into the environment (AUA).

Year of production 2018
Motor power 7.5 kW
Inverter panel with pressure transducer for automatic or manual power regulation
The plant can also be upgraded to Industry 4.0 using a PLC

Also included:
n.7 self-supporting articulated extraction arms with relative supports for wall fixing (arms rotation 360°)
High efficiency pre-filters
Anti-spark prefilters
Activated Carbon Cartridges
Connection hoppers
Floor shelves
Channeling pipes
Support brackets for all pipes
Chimney height 9 meters
Flexible Connections

The plant can be viewed in Paliano (FR) near the new Amazon of Colleferro (RM).
Disassembly (very simple) and transport to be paid by the buyer.

Please note that this description may have been translated automatically. Contact us for further information. The information of this classified ad are only indicative. Exapro recommends to check the details with the seller before a purchase

-------------------
Worked hours
Hours under power
State general-product-state-empty
At local norms ---------
Status
Client type Private person
Active since 2023
Offers online 1
Last activity Jan. 3, 2023

Description

For the transition to a larger plant we yield
Industrial extraction system for welding fumes and metalworking dust.

The plant is fully functional and manufactured by the GGE company (Made in Italy)
The plant also complies with all the regulations currently in force regarding emissions into the environment (AUA).

Year of production 2018
Motor power 7.5 kW
Inverter panel with pressure transducer for automatic or manual power regulation
The plant can also be upgraded to Industry 4.0 using a PLC

Also included:
n.7 self-supporting articulated extraction arms with relative supports for wall fixing (arms rotation 360°)
High efficiency pre-filters
Anti-spark prefilters
Activated Carbon Cartridges
Connection hoppers
Floor shelves
Channeling pipes
Support brackets for all pipes
Chimney height 9 meters
Flexible Connections

The plant can be viewed in Paliano (FR) near the new Amazon of Colleferro (RM).
Disassembly (very simple) and transport to be paid by the buyer.

Please note that this description may have been translated automatically. Contact us for further information. The information of this classified ad are only indicative. Exapro recommends to check the details with the seller before a purchase


Specifications

-------------------
Worked hours
Hours under power
State general-product-state-empty
At local norms ---------
Status

About this seller

Client type Private person
Active since 2023
Offers online 1
Last activity Jan. 3, 2023

Here is a selection of similar machines

GGE 7 kW