Showing 1 - 3 out of 3
Year: 2020
For sale (in full): New built Biomass station (in Latvia) equipment with electrical capacity up to 0,6 MW ( and a heat output of 1,2 MW with wood chips. The cogeneration plant is designed for biofuel (chips) with humidity max. 10% for combustion and for the production of wood gas used to power internal combustion engines to power a generator …Year: 2008
Equipped biomass power plant with the necessary infrastructure The Biomass power plant includes a Siemens turbine with a guaranteed electric power of 1,998 kW. The plant needs approximately 1.8 tons of biomass for each MWh produced. electricity. The power plant uses biomass as the main fuel. The plant requires approximately 1.8 tons of biomass for each produced MWh en. eclectic. …Year: 2016
Man engines D-2862LE223 ........ THREE UNITS 12 CYLINDER 1375 KVA, 1100 KW. 400/230V, RPM-1500 1800AMPS BUILT 2016/12 running hour below :- 1) 6730 2) 8150 3) 8370 Above three engines Running hour